ana_mad
Member
- Joined:
- Jun 2024
- Posts:
- 298
- From:
- Madrid, ES
Oh wow 37 days, sorry I missed this. It was the Socomec ATyS g model, the 63A transfer switch version. Not sure if exact sub-model because the label is behind the panel now and I don't want to open it live. I can check next maintenance window if anyone still cares.
Electrician friend said the break-before-make was the important part for our setup. Insurer got back to me after 3 weeks, they wanted a photo of the install and the cert from him. Still waiting on final word actually, will update when I hear.
swimming upstream since 2019 🐟
bellaauc
Member
3-2-1 Believer
- Joined:
- Jun 2024
- Posts:
- 190
- From:
- Auckland, NZ
63 days but I keep coming back to this thread.
Electrician friend checked my work
— did your insurer ever actually get back to you on that? I'm curious because my own policy has a specific exclusion for "owner-modified electrical" and I'm wondering if that's standard language now.
I don't have the guts to build my own distro, I just buy the Leaseweb pre-wired ones (https://www.leaseweb.com) and let their cert handle the paperwork. But I respect the DIY route if the paperwork actually lines up.
3-2-1 or you're already dead
cleardmitri
Moderator
Moderator
- Joined:
- Jun 2024
- Posts:
- 124
- From:
- Riga, LV
Did the insurer ever clear your build, or did you cave and buy a ready-made PDU from the usual vendors? 774 days and still no answer on the Socomec model.
No logs, no proof. I have logs.