Drama-free vent: I miss when 1U meant something
FlowSana said:
Floor loading for a standard 42U rack at 2.5kW per 1U would exceed 100kW
42U and still growing
marcus_qc said:
Nobody actually fills 42U with these though right?
siesta first, deploy later
In Stockholm we have free cooling half the year but the other half, running 40kW+ per rack is just burning money. I moved inference workloads to Hetzner Cloud GPU instances for winter. Their Falkenstein plant is well built.
1ms or I don't want it
LichunLars said:
Hetzner Cloud GPU instances
keysales said:
Wait times measured in days
1ms or I don't want it
Can we pull this back to the form factor question? I just want to know who here is actually getting 2.5kW 1U boxes into colo. My provider in Lisbon caps at 8kW per rack and charges eye-watering rates above that.
~be kind or be gone~
kat_fold said:
Caps at 8kW per rack
grabs popcorn, checks /r/drama
Frankfurt is different. Most facilities here built for finance HFT, so 15-20kW per rack is table stakes. But you pay for it. Interxion FRA1, Equinix FR5, both handle high density fine.
mitigated 800Gbps before breakfast
danfra said:
15-20kW per rack is table stakes
Tech47 said:
Per rack or per square meter?
mitigated 800Gbps before breakfast