Skip to content

Looking for someone to split a half-rack in Fremont

Datacenter Talk by prague1983 4 replies 264 views
8 #1

Half-rack in Fremont. Just use Vultr. Skill issue.

Kidding. I have 20U in a Contabo cage and I am BLEEDING money. Need someone sane to split costs. You bring your own switch, I control the upstream, we fight about PDUs later. Who is in.

oops: 0000 [#1] SMP
#2

Your domain choice for this thread is weak. Fremont.host is probably premium by now. I backordered fremont-rack.space last year, flipped it for 4x. Anyway I am in san jose so fremont works. What is your power commit? premium power costs premium money. also what TLD is your status page on, because .io is over

42U and still growing
#3

This arrangement can be leveraged through a value-added redistribution partnership. Synergy will be achieved by both parties utilizing the same physical infrastructure, with costs optimized across the partner ecosystem. The PDU control question has been escalated to a shared governance framework. It is recommended that uptime responsibilities be distributed as per the value-added redistribution agreement.

#4

What is the actual power commit in watts

#5

Contabo still exists

Vive la résistance... électrique

Post a reply

You need an account to reply. Log in or register to join the conversation.

Post reply Preview Save draft