lee_mcr
Member
- Joined:
- Sep 2024
- Posts:
- 242
- From:
- Manchester, UK
I don't have their number.
Same. I asked Hetzner sales last quarter about Hillsboro cooling specs for a colo quote. They sent the PUE whitepaper and clammed up on blowdown rates. "Commercially sensitive."
Hillsboro's on the Columbia River basin though. Water's basically free there. Nevada's a different game. Colorado River allocations, drought contingency plans. That water bill might surprise people.
Honey badger don't care... about downtime
Carl
Member
OP
Rack & Stack
- Joined:
- May 2024
- Posts:
- 227
- From:
- Chicago, US
Nevada's a different game. Colorado River allocations
This is why my 2019 Nevada quote died on the vine. Site was great, power cheap, then the water rights lawyer got involved. $0.047/kWh power, sure, but the water assurance bond was six figures annually. My CFO walked.
Tampa's $0.089 looks worse until you price in unrestricted municipal water. We bleed blowdown into the storm drain, no reclamation permit, no lawyer.
Desert math is harder than it looks on the brochure.
visit twice: install and decom