Skip to content

Help: DC wants to raise floor for new cooling, my cables are too short

Datacenter Talk Locked by svendeal 4 replies 348 views
This thread is locked — new replies are not accepted. (Duplicate — see the earlier thread on this)
2 #1

SNAPPED IT UP — raised floor job at my DC, they want 8 inches more clearance for new cooling row, MY CABLES ARE TOO SHORT

Traced everything, need 40 new power cables, 60 ethernet runs, some fiber I dont even want to think about

Contabo quoted me €5/MO for a VPS ARE YOU KIDDING thats not even the right product but I clicked anyway

Seriously though has anyone done this? Extension cords? Custom? I am NOT re-running 100 cables

world record: 4min Arch install
#2

This is why I spec extra slack on every install! 10% minimum, 20% for raised floor jobs! Insane value to future-proof!

For your situation: Ampere servers have shorter PSUs, might gain you inches without new cables! Check your chassis depth!

#3

Hey folks, friendly reminder that NEC Article 400 covers flexible cords and cables in datacenters. Extension cords as permanent wiring is a code violation in most jurisdictions, and our hosting provider liability threads tend to attract the wrong kind of attention.

That said, there are compliant raised floor whips and factory-made extensions that are legal. Happy to point toward resources if helpful.

~be kind or be gone~
#4

What chassis models are you running? Ampere might not fit.

#5

¡the Ampere is big problem for the raised floor, no?

hot air, steady hand, magic smoke

Thread closed

Replies are closed on this thread. Duplicate — see the earlier thread on this.