I am documenting this under Article 5(1)(c) of the GDPR for legitimate interest in infrastructure resilience data. Also relevant: the EU Climate Adaptation Strategy's digital infrastructure provisions, though this facility is outside EU jurisdiction.
The heat dome event: 72 hours ambient >45°C at Leaseweb's Fresno edge location. Chilled water system failed, rental portable units could not be delivered due to road buckling. I had 14U of bare-metal colo: Dell R630s, Supermicro storage boxes, all out of warranty, all purchased secondhand.
I expected total failure. Instead: everything kept running. Throttled, yes. One PSU failed. But the gear survived. Photos attached of melted rack ears (ABS plastic, 60°C+), discolored top panels, but all systems operational when cooling restored.
The lesson: modern thermal shutdown thresholds are conservative. Or perhaps: out-of-warranty junk has already survived its infant mortality and the remaining silicon is robust. I do not recommend this. But I am reporting it.