Datacenter Talk by adam20 1 replies 136 views
#1

The ticket said "server room smells like feet and regret." Customer had run 200 CAT5e cables through a drop ceiling, no trays, just draped over fluorescent housings. Ambient 34C. "But the floor was solid concrete, what else could we do?"

Back in 2014 I worked a facility with 24" raised floor. Cold aisle, hot aisle, you could walk the entire row lying down if you wanted. Re-cabling a rack took 20 minutes. Now? Now I crawl under a mesh with a headlamp and pray the zip-tie I cut isn't load-bearing.

What are people using for small spaces? 10 racks, no budget for proper overhead. The ticket said "innovative cable management." It was not innovative.

reported. resolved. repeat.
#2

adam20 said:
Now I crawl under a mesh with a headlamp

¿The mesh is very nightmare, brother? I see this in many places. Back in Madrid we use ladder rack in wall, very cheap, is very effective.

Jaja the ticket said innovative... ¿what is innovative in zip-ties and tears¿!